Monday, October 26, 2009
Wow a Triac in the flesh
I went to the "Green Car Co" in Bellevue Wa. this weekend, and there it was the Triac in the flesh, or should I say fiberglass. To my surprise it was not proudly on display with the other ev's in the display room. Almost as if they were ashamed of it. The Triac was through a large opening into the shop where they repair cars, and had dust all over it from the shop.The car was sent up from Green Vehicles for the "Beyond Oil conference". They were told that it is a prototype, and there’s was not ready yet. I am a little skeptical though. The prototype I am used to seeing is the older body style with the center headlight. This one clearly looked like one of the 7 that were shipped here from China two months ago.Green car co was so disappointed in the quality of the car that they did not even take it to the conference. I did see some things that clearly were not good quality in the interior panels. One of the indentations in the plastic near the cup holders was so thin there was a hole in it big enough to stick a couple of fingers in. There were also a couple of places where two panels come together that the black plastic was rough, and had white showing where it was either cut , or the black had just been rubbed off.I was able to sit in it and one of my fears turned out true. My head hits the roof :(. I am not sure what can be done about that. The seats sit in contact with the battery box, so they can not be lowered. It might be possible to adjust the seat position and angle to get around the problem. No one was there that knew anything about it.I am anxious to here what Ehab from Green Vehicles has to say about there car as well as mine.
Monday, October 12, 2009
One more little delay, but worth it
Well there has been one more little delay, but it is worth it. It turns out there is a dealership opening (in Bellevue WA) about 25 miles from where I live. Part of the agreement with them is that they get the first Triac, so there's got done first. This is good for me because if I have a problem I have somewhere to go now.
Mine is suppose to be ready to ship by next week. The dealers Triac is being delivered tomorrow. I plan on going down to see one for the first time in person.
Mine is suppose to be ready to ship by next week. The dealers Triac is being delivered tomorrow. I plan on going down to see one for the first time in person.
Tuesday, October 6, 2009
Where can it be?
Oh where oh were has my Triac gone, oh where oh where can it be.
I called Green Vehicles on October 2nd, the day they assured me it would be done, and I have not heard back yet.
Searching on the net I discovered that the 2009 ALTCAR Expo (Alternative energy and transportation expo) was October 2nd and 3rd in Santa Monica CA. The list of exhibitors included Green Vehicles. I can only guess that they have been very busy getting ready for it, and that is why I have not heard back.
The big question now is "Oh where oh were has my Triac gone, oh where oh where can it be".
I called Green Vehicles on October 2nd, the day they assured me it would be done, and I have not heard back yet.
Searching on the net I discovered that the 2009 ALTCAR Expo (Alternative energy and transportation expo) was October 2nd and 3rd in Santa Monica CA. The list of exhibitors included Green Vehicles. I can only guess that they have been very busy getting ready for it, and that is why I have not heard back.
The big question now is "Oh where oh were has my Triac gone, oh where oh where can it be".
Wednesday, September 16, 2009
Still on schedule since last update
Well I just got off the phone with Ehab at Green Vehicles. The hub will be in early next week, and he is confident that by Oct 2nd he will have my Triac finished.
Tuesday, September 1, 2009
more delays
Well I just got an update, and it seems the two weeks to finish the assembly in California is going to turn into around 4 weeks.
The installation of the electronics, battery box & batteries along with connections is taking longer than expected. The real hold up is the custom transmission/motor hub. I think it was about two months ago I learned of a bearing sidewall failure in the mating of the motor and transmission. I believe this is why they are waiting on the new custom hub. Mr. Youssef will give me a better update by next week.
I just pray that I will get it by the time the rains start up. As anyone who has lived in western Washington knows, it can get quite wet. And when it starts, well lets just say gurgle gurgle gurgle blub blub blub.
The installation of the electronics, battery box & batteries along with connections is taking longer than expected. The real hold up is the custom transmission/motor hub. I think it was about two months ago I learned of a bearing sidewall failure in the mating of the motor and transmission. I believe this is why they are waiting on the new custom hub. Mr. Youssef will give me a better update by next week.
I just pray that I will get it by the time the rains start up. As anyone who has lived in western Washington knows, it can get quite wet. And when it starts, well lets just say gurgle gurgle gurgle blub blub blub.
Monday, August 24, 2009
The Triac's have arived!!!!!!!
I just got off the phone with Lee at GreenVehicles. The Triac's arrived last Friday, and they are in the process of installing the electronics. This should take up to two weeks to complete.
The dream is getting closer.
The dream is getting closer.
Monday, August 10, 2009
Ultracapacitor Pac for extending range

When I get my Triac I would like to eventually get an ultracapacitor pac installed. I have been following the one pictured here, and the results are very good. They claim about a 30% increase in range, although the true benafit is it decreases the stress on the batteries durring accelaration, and captures most if not all of the regenerative breaking. Lead acid batteries can only absorb about 10%.
Subscribe to:
Posts (Atom)